Public · no account

The Rubric Bank — with all five levels

234 written Arabic criteria, each with five anchors describing exactly what separates one level from the next. These are the same criteria your work is measured against — open to read before you pay anything.

Having your own work read against one criterion (optional):

Price: 7 SAR · Included in Pro & Artist Plus · First one free — Pricing details

Art
Skill
Level

16 criteria

CRF-B-01 Construction Beginner
Material Quality

Choosing materials appropriate to product and ensuring their quality

The five levels →
CRF-B-02 Construction Beginner
Execution Precision

Executing product with precision and attention to detail

The five levels →
CRF-B-03 Construction Beginner
Final Finish

Quality of product's final appearance and concealing manufacturing flaws

The five levels →
CRF-B-04 Construction Beginner
Dimensional Discipline

Adhering to planned dimensions and measurements

The five levels →
CRF-B-06 Construction Beginner
Functional Fitness

The product performing its intended function efficiently and comfortably

The five levels →
CRF-B-07 Construction Beginner
Structural Durability

The product's ability to withstand use and time without damage

The five levels →
CRF-B-10 Construction Beginner
Joinery Integrity

Quality of joining the product's parts and concealing or intentionally revealing joints

The five levels →
CRF-B-16 Construction Beginner
Joint & Structural Integrity

Tight joints and a piece that holds functionally: the joint bears load, the vessel doesn't leak, the structure doesn't loosen.

The five levels →
CRF-B-18 Construction Beginner
Symmetry & Precision

Discipline of axes, measurements, and repetition; intended symmetry or its intended breaking.

The five levels →
CRF-CER-01 Construction Intermediate
Clay Centring

Centring the clay mass steadily on the axis before forming — the base of every balanced ceramic piece.

The five levels →
CRF-CER-02 Construction Intermediate
Wall Evenness

Even wall thickness from base to rim, a sign of control and material efficiency.

The five levels →
CRF-TEX-02 Construction Intermediate
Thread Tension

Tuning thread tension so it neither puckers the fabric nor leaves the stitch loose.

The five levels →
CRF-WUD-01 Construction Intermediate
Woodwork Joint Cleanliness

Tight wood joints (mortise-tenon, dovetail) without gaps, holding without relying on glue.

The five levels →
CRF-MET-01 Construction Intermediate
Solder Joint Cleanliness

Clean, tight solder joints without gaps, excess, or burns.

The five levels →
CRF-MET-02 Construction Intermediate
Metal Symmetry

Symmetry of the metal piece's axes and precision of its repeated measurements.

The five levels →
CRF-ORN-01 Construction Intermediate
Geometric Grid Precision

Precision of the Islamic ornament grid and the symmetry and closure of its repeat.

The five levels →